|
|
AC Power Leads AC Surge Protector SPD Patch Cable, NEMA 5-20P to IEC 60320 C-15 10 Feet
- 3500-072
- Transtector
-
1:
£78.67
-
Non-Stocked Lead-Time 9 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-3500-072
New At Mouser
|
Transtector
|
AC Power Leads AC Surge Protector SPD Patch Cable, NEMA 5-20P to IEC 60320 C-15 10 Feet
|
|
Non-Stocked Lead-Time 9 Weeks
|
|
|
£78.67
|
|
|
£72.20
|
|
|
£69.42
|
|
|
£67.10
|
|
|
£59.57
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
AC Power Leads AC Surge Protector SPD Patch Cable, NEMA 5-15P to IEC 60320 C-15 10 Feet
- 3520-237
- Transtector
-
1:
£16.52
-
Non-Stocked Lead-Time 12 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-3520-237
New At Mouser
|
Transtector
|
AC Power Leads AC Surge Protector SPD Patch Cable, NEMA 5-15P to IEC 60320 C-15 10 Feet
|
|
Non-Stocked Lead-Time 12 Weeks
|
|
|
£16.52
|
|
|
£14.03
|
|
|
£12.99
|
|
|
£12.53
|
|
|
View
|
|
|
£12.11
|
|
|
£11.45
|
|
|
£10.76
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips AC EDGE Rack Mount PDU Breaker 240 Vac 5A
- 3750-289
- Transtector
-
1:
£46.75
-
Non-Stocked Lead-Time 10 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-3750-289
New At Mouser
|
Transtector
|
Power Outlet Strips AC EDGE Rack Mount PDU Breaker 240 Vac 5A
|
|
Non-Stocked Lead-Time 10 Weeks
|
|
|
£46.75
|
|
|
£39.43
|
|
|
£38.07
|
|
|
£36.71
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips AC EDGE Rack Mount PDU AC Breaker 240 Vac Single Pole 10A
- 3750-290
- Transtector
-
1:
£54.43
-
Non-Stocked Lead-Time 7 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-3750-290
New At Mouser
|
Transtector
|
Power Outlet Strips AC EDGE Rack Mount PDU AC Breaker 240 Vac Single Pole 10A
|
|
Non-Stocked Lead-Time 7 Weeks
|
|
|
£54.43
|
|
|
£45.91
|
|
|
£44.32
|
|
|
£42.74
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips AC EDGE Rack Mount PDU Breaker 10A
- 3750-296
- Transtector
-
1:
£74.13
-
Non-Stocked Lead-Time 8 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-3750-296
New At Mouser
|
Transtector
|
Power Outlet Strips AC EDGE Rack Mount PDU Breaker 10A
|
|
Non-Stocked Lead-Time 8 Weeks
|
|
|
£74.13
|
|
|
£63.57
|
|
|
£61.38
|
|
|
£59.19
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips AC EDGE Rack Mount PDU Breaker 15A
- 3750-297
- Transtector
-
1:
£56.53
-
Non-Stocked Lead-Time 8 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-3750-297
New At Mouser
|
Transtector
|
Power Outlet Strips AC EDGE Rack Mount PDU Breaker 15A
|
|
Non-Stocked Lead-Time 8 Weeks
|
|
|
£56.53
|
|
|
£47.68
|
|
|
£46.03
|
|
|
£44.39
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC EDGE Rack Mount PDU Breaker 25A
- 3750-301
- Transtector
-
1:
£20.85
-
Non-Stocked Lead-Time 8 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-3750-301
New At Mouser
|
Transtector
|
Power Outlet Strips DC EDGE Rack Mount PDU Breaker 25A
|
|
Non-Stocked Lead-Time 8 Weeks
|
|
|
£20.85
|
|
|
£17.01
|
|
|
£15.82
|
|
|
£15.29
|
|
|
View
|
|
|
£13.88
|
|
|
£13.58
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC Breaker, 1U, 1A
- DCBKR1B-1
- Transtector
-
1:
£38.52
-
Non-Stocked Lead-Time 2 Weeks
-
New At Mouser
|
Mouser Part No
21-DCBKR1B-1
New At Mouser
|
Transtector
|
Power Outlet Strips DC Breaker, 1U, 1A
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
|
£38.52
|
|
|
£31.43
|
|
|
£29.50
|
|
|
£28.45
|
|
|
£27.13
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC Breaker, 1U, Blank
- DCBKR1B-BLANK
- Transtector
-
1:
£24.49
-
Non-Stocked Lead-Time 2 Weeks
-
New At Mouser
|
Mouser Part No
21-DCBKR1B-BLANK
New At Mouser
|
Transtector
|
Power Outlet Strips DC Breaker, 1U, Blank
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
|
£24.49
|
|
|
£19.98
|
|
|
£18.44
|
|
|
£17.73
|
|
|
£16.31
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC Breaker, 2U, 100A
- DCBKR2B-100
- Transtector
-
1:
£71.08
-
Non-Stocked Lead-Time 2 Weeks
-
New At Mouser
|
Mouser Part No
21-DCBKR2B-100
New At Mouser
|
Transtector
|
Power Outlet Strips DC Breaker, 2U, 100A
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
|
£71.08
|
|
|
£60.95
|
|
|
£58.85
|
|
|
£56.74
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC Breaker, 2U, 125A
- DCBKR2B-125
- Transtector
-
1:
£181.97
-
Non-Stocked Lead-Time 2 Weeks
-
New At Mouser
|
Mouser Part No
21-DCBKR2B-125
New At Mouser
|
Transtector
|
Power Outlet Strips DC Breaker, 2U, 125A
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC Breaker, 2U, 150A
- DCBKR2B-150
- Transtector
-
1:
£181.97
-
Non-Stocked Lead-Time 2 Weeks
-
New At Mouser
|
Mouser Part No
21-DCBKR2B-150
New At Mouser
|
Transtector
|
Power Outlet Strips DC Breaker, 2U, 150A
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC Breaker, 2U, 2.5A
- DCBKR2B-2.5
- Transtector
-
1:
£55.00
-
Non-Stocked Lead-Time 2 Weeks
-
New At Mouser
|
Mouser Part No
21-DCBKR2B-2.5
New At Mouser
|
Transtector
|
Power Outlet Strips DC Breaker, 2U, 2.5A
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
|
£55.00
|
|
|
£46.39
|
|
|
£44.79
|
|
|
£43.19
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC Breaker, 2U, 20A
- DCBKR2B-20
- Transtector
-
1:
£56.85
-
Non-Stocked Lead-Time 2 Weeks
-
New At Mouser
|
Mouser Part No
21-DCBKR2B-20
New At Mouser
|
Transtector
|
Power Outlet Strips DC Breaker, 2U, 20A
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
|
£56.85
|
|
|
£48.21
|
|
|
£46.55
|
|
|
£44.88
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC Breaker, 2U, 25A
- DCBKR2B-25
- Transtector
-
1:
£56.85
-
Non-Stocked Lead-Time 2 Weeks
-
New At Mouser
|
Mouser Part No
21-DCBKR2B-25
New At Mouser
|
Transtector
|
Power Outlet Strips DC Breaker, 2U, 25A
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
|
£56.85
|
|
|
£48.21
|
|
|
£46.55
|
|
|
£44.88
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC Breaker, 2U, 40A
- DCBKR2B-40
- Transtector
-
1:
£56.85
-
Non-Stocked Lead-Time 2 Weeks
-
New At Mouser
|
Mouser Part No
21-DCBKR2B-40
New At Mouser
|
Transtector
|
Power Outlet Strips DC Breaker, 2U, 40A
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
|
£56.85
|
|
|
£48.21
|
|
|
£46.55
|
|
|
£44.88
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC Breaker, 2U, 5A
- DCBKR2B-5
- Transtector
-
1:
£56.85
-
Non-Stocked Lead-Time 2 Weeks
-
New At Mouser
|
Mouser Part No
21-DCBKR2B-5
New At Mouser
|
Transtector
|
Power Outlet Strips DC Breaker, 2U, 5A
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
|
£56.85
|
|
|
£48.21
|
|
|
£46.55
|
|
|
£44.88
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips DC Breaker, 2U, 50A
- DCBKR2B-50
- Transtector
-
1:
£56.85
-
Non-Stocked Lead-Time 2 Weeks
-
New At Mouser
|
Mouser Part No
21-DCBKR2B-50
New At Mouser
|
Transtector
|
Power Outlet Strips DC Breaker, 2U, 50A
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
|
£56.85
|
|
|
£48.21
|
|
|
£46.55
|
|
|
£44.88
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power Outlet Strips Rack mount DC PDU Rack Mount PDU DC 1RU -24 to -48 Vdc Single-Feed 1x 150A Feeds 16x Per Feed
- DCPDU1B-S-X16-150
- Transtector
-
1:
£1,025.85
-
Non-Stocked Lead-Time 2 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-DCPDU1B-S-X16-150
New At Mouser
|
Transtector
|
Power Outlet Strips Rack mount DC PDU Rack Mount PDU DC 1RU -24 to -48 Vdc Single-Feed 1x 150A Feeds 16x Per Feed
|
|
Non-Stocked Lead-Time 2 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 5 1 Port 802.3af Type B
- PI-1C5-AFB
- Transtector
-
1:
£15.17
-
Non-Stocked Lead-Time 11 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-PI-1C5-AFB
New At Mouser
|
Transtector
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 5 1 Port 802.3af Type B
|
|
Non-Stocked Lead-Time 11 Weeks
|
|
|
£15.17
|
|
|
£14.55
|
|
|
£14.14
|
|
|
£13.76
|
|
|
View
|
|
|
£13.47
|
|
|
£13.19
|
|
|
£12.83
|
|
|
£12.56
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 5 1 Port 802.3af Type B w/ Lightning Protection
- PI-1C5-AFB-LP
- Transtector
-
1:
£44.05
-
Non-Stocked Lead-Time 11 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-PI-1C5-AFB-LP
New At Mouser
|
Transtector
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 5 1 Port 802.3af Type B w/ Lightning Protection
|
|
Non-Stocked Lead-Time 11 Weeks
|
|
|
£44.05
|
|
|
£42.21
|
|
|
£41.08
|
|
|
£39.96
|
|
|
View
|
|
|
£39.13
|
|
|
£38.32
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 5e 1 Port 802.3af Type B w/ Lightning Protection
- PI-1C5E-AFB-LP
- Transtector
-
1:
£72.97
-
Non-Stocked Lead-Time 11 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-PI-1C5E-AFB-LP
New At Mouser
|
Transtector
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 5e 1 Port 802.3af Type B w/ Lightning Protection
|
|
Non-Stocked Lead-Time 11 Weeks
|
|
|
£72.97
|
|
|
£69.52
|
|
|
£68.06
|
|
|
£66.20
|
|
|
View
|
|
|
£64.82
|
|
|
£63.48
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 6 1 Port 802.3af Type B DIN Rail Mount
- PI-1C6-AFB-DN
- Transtector
-
1:
£44.05
-
Non-Stocked Lead-Time 11 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-PI-1C6-AFB-DN
New At Mouser
|
Transtector
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 6 1 Port 802.3af Type B DIN Rail Mount
|
|
Non-Stocked Lead-Time 11 Weeks
|
|
|
£44.05
|
|
|
£42.21
|
|
|
£41.08
|
|
|
£39.96
|
|
|
View
|
|
|
£39.13
|
|
|
£38.32
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 6 1 Port 802.3at Type B w/ Lightning Protection
- PI-1C6-ATB-LP
- Transtector
-
1:
£34.72
-
Non-Stocked Lead-Time 11 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-PI-1C6-ATB-LP
New At Mouser
|
Transtector
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 6 1 Port 802.3at Type B w/ Lightning Protection
|
|
Non-Stocked Lead-Time 11 Weeks
|
|
|
£34.72
|
|
|
£33.07
|
|
|
£32.39
|
|
|
£31.50
|
|
|
View
|
|
|
£30.84
|
|
|
£30.21
|
|
|
£29.37
|
|
Min.: 1
Mult.: 1
|
|
|
|
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 6 1 Port 802.3at Type B DIN Rail Mount w/ Lightning Protection
- PI-1C6-ATB-LPDN
- Transtector
-
1:
£58.87
-
Non-Stocked Lead-Time 11 Weeks Restricted Availability
-
New At Mouser
|
Mouser Part No
21-PI-1C6-ATB-LPDN
New At Mouser
|
Transtector
|
Power over Ethernet - PoE - Industrial Power Over Ethernet PoE Midspan Injector Category 6 1 Port 802.3at Type B DIN Rail Mount w/ Lightning Protection
|
|
Non-Stocked Lead-Time 11 Weeks
|
|
|
£58.87
|
|
|
£56.80
|
|
|
£55.03
|
|
|
£53.41
|
|
|
View
|
|
|
£52.29
|
|
|
£51.21
|
|
Min.: 1
Mult.: 1
|
|
|